Bradford Island Administrative Record File

Bradford Island is located in the Columbia River at the Bonneville Dam, between the spillway and the first powerhouse. Historic releases of contaminants from prior activities at the island have resulted in contamination on the eastern portion of island and in some adjacent waters of the Columbia River. The contamination is managed under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This webpage has been created to help compile a list of documents that are applicable to the administrative record in line with CERCLA requirements. The administrative record is designed to tell the story of a response action selection decision and provide documentation showing how the public was involved in selecting the cleanup.

All documents in the administrative record are listed in the report index below, with links to where they are stored at the USACE digital library. Alternatively, the USACE digital library link below contains all documents in the index that have been uploaded so far.



Report Index

Click the table headers to sort the table accordingly:


ID Status Date Title
1998-12-00-01 Online December 1998 Final Site Inspection Report: Bradford Island Landfill, Cascade Locks Region
2000-06-00-01 Online June 2000 Final: Supplemental Site Inspection Bradford Island Landfill, Cascade Locks, Oregon
2000-12-00-01 Online December 2000 Work plan Bradford Island landfill in-water waste recovery plan
2001-01-31-01 Online January 31, 2001 News release: PCBs found in sediment
2001-04-00-01 Online April 2001 Final: Work Plan, In-Water Investigation, Bradford Island Landfill, Cascade Locks, Oregon
2001-04-00-02 Online April 2001 Final: Sampling and Analysis Plan Phase II Supplemental Site Investigation, Bradford Island, Cascade Locks, Oregon
2001-04-24-01 Online April 24, 2001 News release: Plans for dive near Bonneville Dam modified
2001-04-26-01 Online April 26, 2001 Meeting notes: Bradford Island disposal site technical meeting - April 26, 2001
2001-05-00-01 Online May 2001 Geotechnical Design Report North Slope Regrade and Stabilization, Bradford Island Landfill, Cascade Locks, Oregon
2001-09-00-01 Online September 2001 Final: Work Plan, Phase II Supplemental Site Investigation, Bradford Island Landfill, Cascade Locks, Oregon
2001-09-00-02 Online September 2001 Final: Sampling and Analysis Plan Phase II Supplemental Site Investigation, Bradford Island, Cascade Locks, Oregon
2002-01-00-01 Online January 2002 Final: Sampling and Analysis Plan, In-Water Removal Work, Bradford Island Landfill, Cascade Locks, Oregon
2002-01-00-02 Online January 2002 Final: Work Plan Trashboom Structure Foundation Anchor Sediment Sampling, Bonneville Project, Cascade Locks, Oregon
2002-01-00-03 Online January 2002 Final: Sampling and Analysis Plan Part II - Quality Assurance Project Plan, Trashboom Structure Foundation, Anchor Sediment Sampling, Bonneville Dam Project, Cascade Locks, Oregon
2002-01-00-04 Online January 2002 Final: Sampling and Analysis Plan Phase II Supplemental Site Investigation, Bradford Island, Cascade Locks, Oregon
2002-01-15-01 Online January 15, 2002 News release: DEQ seeks comments on Corps of Engineers draft plan to remove electrical equipment from the Columbia River
2002-02-20-01 Online February 20, 2002 Stormwater drain cleaning summary, Bradford Island, Bonneville Dam, DACW57-99-D-0005, task order no. 0003 modification no. 0002
2002-03-00-01 Online March 2002 Trashboom Structure Foundation Anchor Sediment Sampling Report
2002-03-14-01 Online March 14, 2002 In Water Investigation Report, Bradford Island Landfill
2002-04-00-01 Online April 2002 Level I Ecological Scoping Assessment and Human Health Problem Formulation, Bradford Island Landfill, Bonneville Dam, Cascade Locks, Oregon
2002-06-21-01 Online June 21, 2002 Quality Assurance Project Plan, Bonneville Pool, Polycholrinated Biphenyls Investigation
2002-09-00-01 Online September 2002 Final: Preliminary Assessment and Site Inspection, Sandblast Area Transformer Release Area, Former Drum Storage Area, Bonneville Lock and Dam Project, Cascade Locks, Oregon
2002-09-30-01 Online September 30, 2002 Conceptual Site Model Bonneville Dam Forebay Area Technical Memorandum
2002-10-00-01 Online October 2002 Final: Technical Memorandum In-Water Removal Work, Bradford Island Landfill, Cascade Locks, Oregon
2003-02-00-01 Online February 2003 Final: Sampling and Analysis Plan Part I - Field Sampling Plan Post Removal Sampling, Bonneville Dam Project, Cascade Locks, Oregon
2003-02-00-02 Online February 2003 Final: Bulb Slope Reconnaissance Investigation and Evaluation of Potential Remedial Options, Bradford Island, Bonneville Lock and Dam Project, Cascade Locks, Or
2003-02-00-03 Online February 2003 Final: Work Plan Post Removal Sampling, Bonneville Dam Project, Cascade Locks, Oregon
2003-02-00-04 Online February 2003 Final: Sampling and Analysis Plan II - Quality Assurance Project Plan Post Removal Sampling, Bonneville Dam Project, Cascade Locks, Oregon
2003-02-00-05 Online February 2003 Sampling and analysis plan part I - field sampling plan, trashboom structure foundation anchor sediment sampling: Bonneville Dam project, Cascade Locks, Oregon
2003-02-26-01 Online February 26, 2003 Meeting Summary Results, Post Removal Sampling, Bradford Island Disposal Site
2003-05-00-01 Online May 2003 Preliminary Assessment and Site Inspection Former Pistol Range, Bonneville Lock and Dam Project, Cascade Locks, Oregon
2003-11-24-01 Online November 24, 2003 Final: Post-Removal Sediment Investigation Stage I Data Report, Bonneville Dam Forebay, Cascade Locks, Oregon
2004-04-00-01 Online April 2004 Final: Site Characterization Report, Bradford Island Landfill, Bonneville Lock and Dam Project, Cascade Locks, Oregon
2004-05-06-01 Online May 6, 2004 Technical Memorandum, Evaluation of Archived Clam Tissue Sample Analysis, Bradford Island Sediment Remediation
2004-05-00-01 Online May 2004 Revised Report: Level II Screening Ecological Risk Assessment and Baseline Human Health Risk Assessment, Bradford Island Landfill, Bonneville Dam, Cascade Locks, Oregon
2004-07-09-01 Online July 9, 2004 Technical Memorandum - Risk-Based Concentrations for PCBs in Sediments using Total PCBs, Aroclor-1254 and Congener-based Data
2004-12-00-01 Online December 2004 Post-Removal Sediment Investigation Stage 2 Data Report, Bonneville Dam Forebay, Cascade Locks, Oregon
2005-03-18-01 Online March 18, 2005 Remedial Action Objectives Engineering Evaluation and Cost Analysis, Bradford Island Disposal Site, Bonneville Dam Forebay, Cascade Locks, Oregon
2005-05-13-01 Online May 13, 2005 Programs and Project Management Division (CENWP-PM)(1105-2-10a), Correspondence from CENWP-PW to Warm Springs Confederated Tribes of Oregon
2005-12-12-01 Online December 12, 2005 Quality Assurance Project Plan, Revision 3, Bradford Island Remedial Investigation/Feasibility Study - Pre-In-Water Interim Action Fish Advisory Quality Assurance Project Plan, Bonneville Dam, Bonneville, Oregon
2005-12-22-01 Online December 22, 2005 Final: Engineering Evaluation and Cost Analysis, Bradford Island, Bonneville Dam Forebay, Cascade Locks, Oregon
2006-01-17-01 Online January 17, 2006 Bradford Inland Technical Advisory Group Meeting January 17, 2006
2006-01-17-02 Online January 17, 2006 Supplemental site inspection sandblast area: Bonneville Lock and Dam, Cascade Locks, Oregon
2006-01-31-01 Online January 31, 2006 Meeting Record: Bradford Island, Technical Advisory Group - Risk Subgroup - Meeting
2006-07-00-01 Online July 2006 Community Involvement Plan, Bradford Island Community Involvement Program
2006-02-02-01 Online February 2, 2006 News Release PA 06-016 Corps Seeks Commends on Bradford Island Cleanup, Community Involvement Solicited
2006-07-11-01 Online July 11, 2006 News Release PA 06-097 Bradford Island Community Involvement Committee to Meet, Initial Committee Meeting Scheduled July 17 in Cascade Locks, Oregon
2006-07-17-01 Online July 17, 2006 Bradford Island Community Involvement Program, Community Involvement Committee (CIC) Meeting Summary
2006-06-00-01 Online June 2006 Technical Memorandum: Removal Design Data Gaps Surface Water and Sediment Sampling, Bradford Island and Bonneville Lock and Dam Forebay, Cascade Locks, Oregon
2006-09-18-01 Online September 18, 2006 Bradford Island community involvement program, Community Involvement Committee (CIC) meeting summary, Monday September 18, 2006
2006-10-23-01 Online October 23, 2006 Bradford Island community involvement program, Community Involvement Committee (CIC) meeting summary, October 23, 2006
2007-01-19-01 Online January 19, 2007 Memorandum: Upland source evaluation - Bradford Island Landfill, bulb slope, and site 7
2007-02-07-01 Online February 7, 2007 Bradford Island community involvement program, Community Involvement Committee (CIC), February 7, 2007
2007-05-01-01 Online May 1, 2007 Bradford Island Community Involvement Committee, fact sheet distribution
2007-05-30-01 Online May 30, 2007 Action Memorandum for a Non-Time Critical Removal Action at Bradford Island Disposal Site, Bonneville Dam Forebay, and Cascade Locks, Oregon
2007-06-27-01 Online June 27, 2007 Bradford Island community involvement program, Community Involvement Committee (CIC), June 27, 2007
2007-07-05-01 Online July 5, 2007 Final: Quality Assurance Project Plan, Water Quality Monitoring for the In-Water Removal Action, Bradford Island, Bonneville Lock and Dam Project, Cascade Locks, Oregon
2007-08-27-01 Online August 27, 2007 News Release: Corps to brief area city councils on Bradford Island PCB Removal
2007-09-00-01 Online September 2007 Final: RI/FS Management Plan, Bradford Island, Bonneville Dam Forebay, Cascade Locks, Oregon
2007-09-07-01 Online September 7 2007 Quality Assurance Project Plan, River Operable Unit Remedial investigation, Bradford Island, Bonneville Lock and Dam Project, Cascade Locks, Oregon
2007-09-25-01 Online September 25, 2007 USACE News Release: Removal Begins at Bonneville Dam's Bradford Island
2007-11-01-01 Online November 1, 2007 Memorandum for Record: Bradford Island Technical Advisory Group Meeting Minutes, 9 Oct. 2007
2008-03-10-01 Online March 10, 2008 Pre-Removal Action Sediment and Clam Sample Analysis, Bradford Island Remedial Investigation, Bonneville Dam Forebay, Cascade locks, Oregon
2008-03-17-01 Online March 17, 2008 News Release: DEQ, Corp Announce Results of Tests
2008-05-12-01 Online May 12, 2008 Memorandum: Post-Removal Sample Collection, Bradford Island Disposal Site, Bonneville Dam Forebay - Cascade Locks, Oregon
2008-06-00-01 Online June 2008 Final: Water Quality Monitoring Report, In-Water Removal Action, Bradford Island Disposal Site, Bonneville Lock Forebay, Cascade Locks, Oregon
2008-06-09-01 Online June 9, 2008 Groundwater Monitoring Well Installation Report Bradford Island Upland Operable Unit Remedial Investigation, Cascade Locks, Or
2005-07-08-01 Online July 8, 2005 Subject: Meeting minutes from July 8, 2005, Bradford Island meeting, executive conference room, Portland District, USACE
2008-07-29-01 Online July 29, 2008 River Operable Unit Remedial Investigation Data Summary Report, Bradford Island, Bonneville Dam Forebay, Cascade Locks, Oregon
2008-07-29-02 Online July 29, 2008 First Quarter Groundwater, Seep, and Surface Water Sampling Results, Bradford Island Operable Unit Remedial Investigation, Cascade Locks, Or
2008-10-00-01 Online October 2008 Quality Assurance Project Plan, Upland Operable Unit Remedial investigation, Bradford Island, Bonneville Lock and Dam Project, Cascade Locks, Oregon
2008-10-27-01 Online October 27, 2008 Forebay and Reference Area Smallmouth Bass Collected June 2006 through May 2008 Summary Report, Bradford Island Remedial Investigation, Bonneville Dam Forebay, Cascade Locks, Oregon
2008-10-28-01 Online October 28, 2008 Second Quarter Groundwater, Seep, and Surface Water Sampling Results Bradford Island Upland Operable Unit Remedial Investigation, Cascade Locks, Or
2009-09-02-01 Online September 2, 2009 Goose Island Slough data gap summary report, Bradford Island remedial investigation, Bonneville Dam, Cascade Locks, Oregon, contract no W916G-06-D-0019, task order no. DT01 modification no. 0002
2009-01-21-01 Online January 21, 2009 Memorandum: Sculpin Analysis Strategy, Bradford Island In-Water Operable Unit Remedial Investigation, Bonneville Dam Forebay - Cascade Locks, Oregon
2009-01-21-02 Online January 21, 2009 PCB Congener Results for Sediment, Clams, and Crayfish Collected from Forebay and Reference Area February/March 2008, Bradford Island Remedial Investigation, Bonneville Dam Forebay, Cascade Locks, Oregon
2009-01-21-03 Online January 21, 2009 Third Quarter Groundwater, Seep, and Surface Water Sampling Results Bradford Island Upland Operable Unit Remedial Investigation, Cascade Locks, Or
2009-02-02-01 Online February 2, 2009 Revised Sculpin Analysis Strategy, Bradford Island ins Water Operable Unit Remedial Investigation
2009-02-06-01 Online February 6, 2009 Memorandum: Upland QAPP addendum, Bradford Island upland operable unit remedial investigation, Cascade Locks, Oregon
2009-02-18-01 Online February 18, 2009 Memorandum: Subject: In water QAPP addendum, River Operable Unit remedial investigation, Cascade Locks, Oregon
2009-03-31-01 Online March 31, 2009 Technical Memorandum: Fourth Quarter Groundwater, Seep, and Surface Water Sampling Results, Bradford Island Upland Operable Unit, Remedial Investigation, Cascade Locks, Oregon
2009-06-00-01 Online June 2009 Technical Memorandum Upland Operable Unit Data Gap Sampling JAN-MAR 2009
2009-06-16-01 Online June 16, 2009 Sculpin and PCB Congeners for Downstream Sediment Summary Report, Bradford Island Remedial Investigation, Bonneville Dam, Cascade Locks, Oregon
2009-10-00-01 Online October 2009 River Operable Unit Data Sufficiency Report, Bradford Island Remedial Investigation, Cascade Locks, Oregon
2009-11-00-01 Online November 2009 Upland Operable Unit Data Sufficiency Report, Bradford Island Remedial Investigation, Cascade Locks, Oregon
2010-02-00-01 Online February 2010 Bradford Island – Response to Comments – State of Oregon Department of Environmental Quality (DEQ) Review of River Operable Unit Data Sufficiency Report. Bradford Island, Bonneville Dam Forebay, Cascade Locks, Oregon (RI Reference - URS. 2010b)
2010-02-00-02 Online February 2010 Bradford Island – Response to Comments – State of Oregon Department of Environmental Quality (DEQ) Review of Upland Operable Unit Data Sufficiency Report. Bradford Island, Bonneville Dam Forebay, Cascade Locks, Oregon (RI Reference - URS. 2010c)
2011-06-01-01 Online June 1, 2011 Work Plan Memorandum Supplemental Sampling River Operable Unit
2012-06-00-01 Online June 2012 Upland and River Operable units remedial investigation report: Bradford Island, Cascade Locks, Oregon
2013-02-14-01 Online February 14, 2013 Analytical Results for Sediment, Clams and Bass Collected from Forebay 2011
2013-06-21-01 Online June 21, 2013 Memorandum for record: Bradford Island, river OU feasibility study (FS) Technical Advisory Group (TAG) technical project planning (TPP) meeting, meeting minutes, 21 June 2013
2014-03-03-01 Online March 3, 2014 Technical Memorandum, Update to Risk Assessment Work Plan, Upland Operable Unit
2014-04-14-01 Online April 14, 2014 Memorandum for record: Bradford Island operable unit (OU) risk assessment (RA), upland OU risk assessment technical approach, Technical Advisory Group (TAG) meeting record, April 14, 2014
2014-06-04-01 Online June 4, 2014 Memorandum for record: Bradford Island operable unit (OU) data evaluation and baseline risk assessment approach, Technical Advisory Group (TAG) meeting record, June 4, 2014
2014-07-03-01 Online July 3, 2014 Data Evaluation Technical Memorandum, River Operable Unit, Bradford Island and Bonneville Dam Forebay, Cascades Locks, Oregon
2015-12-01-01 Online December 1, 2015 Bradford Island upland and river OU, Technical Advisory Group meeting: Baseline human health and ecological risk assessments, 1 December 2015
2016-04-00-01 Online April 2016 Final report: Baseline human health and ecological risk assessment, river operable unit: Bradford Island, Cascade Locks, Oregon
2016-04-00-02 Online April 2016 Final report: Baseline human health and ecological risk assessment, upland operable unit: Bradford Island, Cascade Locks, Oregon
2017-08-11-01 Online August 11, 2017 Final feasibility study: Bradford Island Upland Operable Unit, Cascade Locks, Oregon
2017-09-00-01 Online September 2017 Addendum - Bradford Island River Operable Unit, Reevaluation of Baseline Risk Assessment Calculations
2018-01-17-01 Online January 17, 2018 TAG Meeting minutes, 17 January 2018
2018-02-08-01 Online February 8, 2018 TAG Meeting minutes, 08 February 2018
2018-03-08-01 Online March 8, 2018 TAG Meeting minutes, 08 March 2018
2018-04-05-01 Online April 5, 2018 TAG Meeting minutes, 05 April 2018
2018-05-03-01 Online May 3, 2018 TAG Meeting minutes, 03 May 2018
2018-05-08-01 Online May 8, 2018 Final Work Plan with Quality Assurance Project Plan for Catch Basin Solids and Stormwater Sampling at Sandblast AOPC, Bradford Island, Cascade Locks, Oregon
2018-06-07-01 Online June 7, 2018 TAG Meeting minutes, 07 June 2018
2018-09-18-01 Online September 18, 2018 Final Catch Basin Solids Data Report, Sandblast AOPC, Bradford Island, Cascade Locks, OR [with Level 2 data lab report]
2018-09-18-02 Online September 18, 2018 Final Catch Basin Solids Data Report, Sandblast AOPC, Bradford Island, Cascade Locks, OR [with Level 4 data lab report]
2018-09-27-01 Online September 27, 2018 Bradford Island Technical Advisory Group meeting: SPME update
2018-12-13-01 Online December 13, 2018 TAG Meeting minutes, 13 December 2018
2019-01-22-01 Online January 22, 2019 Bradford Island Technical Advisory Group: Proposed approach for SA1
2019-02-15-01 Online February 15, 2019 Stormwater Data Report, Sandblast AOPC, Bradford Island, Cascade Locks, OR
2019-03-04-01 Online March 4, 2019 Work Plan with Quality Assurance Project Plan Amendment 1 for Catch Basin Solids and Stormwater Sampling at Sandblast AOPC, Bradford Island, Cascade Locks, Oregon
2019-04-25-01 Online April 25, 2019 TAG Meeting minutes, 25 April 2019
2019-09-30-01 Online March 9, 2019 Final work plan for passive sampling at river OU, Bradford Island, Cascade Locks, Oregon
2019-05-23-01 Online May 23, 2019 TAG Meeting minutes, 23 May 2019
2019-07-25-01 Online July 25, 2019 TAG Meeting minutes, 25 July 2019
2019-08-22-01 Online August 22, 2019 TAG Meeting minutes, 22 August 2019
2019-09-26-01 Online September 26, 2019 Landfill and pistol range
2019-12-02-01 Online September 26, 2019 TAG meeting minutes, 02 December 2019
2020-01-06-01 Online January 6, 2020 TAG Meeting minutes, 6 January 2020
2020-01-23-01 Online January 23, 2020 Final Quality Assurance Project Plan for Passive Sampling at River Operable Unit, Bradford Island, Cascade Locks, Oregon
2020-02-13-01 Online February 13, 2020 TAG Meeting minutes, 13 February 2020
2020-03-20-01 Online March 20, 2020 TAG Meeting minutes, 20 March 2020
2020-04-16-01 Online April 16, 2020 TAG Meeting minutes, 16 April 2020
2020-05-21-01 Online May 21, 2020 TAG Meeting minutes, 21 May 2020
2020-06-10-01 Online June 10, 2020 Field Report: Passive Sampling Deployment and Retrieval, River Operable Unit, Bradford Island, Cascade Locks, OR
2020-07-14-01 Online July 14, 2020 TAG Meeting minutes, 14 July 2020
2020-08-03-01 Online August 3, 2020 TAG Meeting minutes, 03 August 2020
2020-08-14-01 Online August 14, 2020 Final Work Plan with Quality Assurance Project Plan for Smallmouth Bass Acoustic Telemetry and Tissue Sampling and Crayfish Tissue Sampling at River Operable Unit, Bradford Island, Cascade Locks, Oregon
2020-09-08-01 Online September 8, 2020 TAG Meeting minutes, 08 September 2020
2020-10-20-01 Online October 20, 2020 TAG meeting minutes, 20 October 2020
2020-12-14-01 Online December 14, 2020 TAG meeting minutes, 14 December 2020
2021-01-13-01 Online January 13, 2021 TAG meeting minutes, 13 January 2021
2021-03-15-01 Online March 15, 2021 TAG meeting minutes, 15 March 2021
2021-03-29-01 Online March 29, 2021 TAG meeting minutes, 29 March 2021
2021-05-06-01 Online May 6, 2021 Geotechnical Exploration Field Plan at Bulb Slope AOPC, Bradford Island, Cascade Locks, Oregon
2021-06-24-01 Online May 6, 2021 TAG meeting minutes, 24 June 2021
2021-08-13-01 Online August 13, 2021 Final Revised Work Plan with Quality Assurance Project Plan for Soil Sampling at Sandblast AOPC, Bradford Island, Cascade Locks, Oregon
2021-09-30-01 Online September 30, 2021 Optimization review: Bradford Island Upland and River Operable Units, Cascade Locks, Oregon: Final report
2021-12-00-01 Online December 2021 Geotechnical Data Report: Bradford Island Bulb Slope Subsurface Exploration, Cascade Locks, Oregon
2021-12-22-01 Online December 22, 2021 Final Memorandum for Record, Bradford Island, River Operable Unit, Prepared by USACE Seattle and Portland Districts, 22 December 2021; Re: Criteria for Evaluating PCB Congeners
2022-02-00-01 Online February 2022 Final Field Report and Data Report, Sandblast AOPC, Upland Operable Unit, Bradford Island, Cascade Locks, OR
2022-03-00-01 Online March 2022 Final Work Plan with Quality Assurance Project plan for Groundwater Sampling at Upland OU, Bradford Island, Cascade Locks, Oregon
2022-03-04-01 Online March 4, 2022 Final Work Plan with Quality Assurance Project Plan for Smallmouth Bass Acoustic Telemetry and Tissue Sampling For Spring 2022 at River Operable Unit, Bradford Island, Cascade Locks, Oregon
2022-08-00-01 Online August 2022 Field report: Bass collection, River Operable Unit, Bradford Island, Cascade Locks, OR
2022-11-29-01 Online November 29, 2022 Stormwater and Catch Basin Solids Data Report and Best Management Practices Evaluation, Sandblast Area AOPC, Bradford Island
2023-01-20-01 Online January 20, 2023 Bradford Island Superfund Site Community Involvement Program: Final Interview Report
2023-03-20-01 Online March 20, 2023 March 20th, 2023, Bradford Island National Priorities List site, RAB meeting documents
2023-05-09-01 Online May 9, 2023 May 9th, 2023, Bradford Island National Priorities List site, RAB meeting documents
2023-06-13-01 Online June 13, 2023 June 13th, 2023, Bradford Island National Priorities List site, RAB meeting documents
2023-07-11-01 Online July 11, 2023 July 11th, 2023, Bradford Island National Priorities List site, RAB meeting documents
2023-09-12-01 Online September 12, 2023 September 12th, 2023, Bradford Island National Priorities List site, RAB meeting documents
2023-11-14-01 Online November 14, 2023 November 14, 2023, Bradford Island National Priorities List site, RAB meeting documents

Guidance documents that are referenced as bibliographic sources in documents contained within the Administrative Record that are publicly available elsewhere are not listed separately in this index.

These electronic files contain the text of records established by the U.S. Army Corps of Engineers (USACE). These files may have been converted to make the documents more easily readable on your computer screen. Efforts have been made, though not guaranteed, to note in the text or bookmarks when and where graphics, oversized materials and/or other content has not been included in the courtesy copy. Formatting (margins, page numbering, etc.) may be different than the record copy.

Metadata has been added to the electronic files to make the files more useful. This metadata is not part of the official record copy.